Now booking free consultationsLicensed & insured · COI-ready for co-ops & condos
  1. Home
  2. Services
  3. Kitchen Renovation
Kitchen Renovation

Kitchen renovations built for New York living

From galley kitchens in prewar co-ops to open-plan brownstone kitchens, we design and build kitchens that make every square foot work harder — with clean detailing that lasts.

Kitchen renovations built for New York living
ServingManhattan · Brooklyn · Queens · Bronx · NJ
Overview

Kitchen Renovation done properly.

A New York kitchen has to do a lot in very little space. Our kitchen remodeling process starts with how you actually use the room: where you prep, where the coffee lives, how many people cook at once, and what your building will allow for plumbing, gas and venting.

Ally Renovations NYC handles the full kitchen scope under one roof — demolition, framing, rough plumbing and electrical coordination, drywall, cabinetry, countertops, tile, lighting and finish painting — so you have one accountable team and one schedule from start to finish.

  • Free walkthrough and itemized written estimate
  • COIs for co-op, condo and commercial buildings
  • Licensed plumbing & electrical partners
Kitchen Renovation project by Ally Renovations NYC
Scope of work

What's included.

Every project is quoted to your space, but these are the services we deliver most often.

  • 01
    Layout & design planningSpace planning, cabinet layouts and finish selections that respect your building's wet-over-dry and venting rules.
  • 02
    Custom & semi-custom cabinetryShaker, slab and wood-grain cabinets, pantry towers and smart storage installed plumb, level and scribed tight.
  • 03
    CountertopsQuartz, natural stone and solid-surface counters with clean seams, waterfall ends and undermount sinks.
  • 04
    Backsplash & tileSubway, zellige, slab and large-format backsplashes set with tight, consistent grout lines.
  • 05
    Lighting & electricalRecessed lighting, pendants, under-cabinet LEDs and dedicated appliance circuits by licensed trades.
  • 06
    Appliance installationGas ranges, vented hoods, dishwashers and built-in refrigeration installed and tested.
From our job sites

Recent kitchens work.

Full gallery
Kitchen Renovation — wood cabinets quartz
Kitchen Renovation — gas range quartz backsplash
Kitchen Renovation — office kitchenette open shelving
Kitchen Renovation — cabinet install progress
Our process

How your project runs.

Clear steps, regular updates and one point of contact.

1

Walkthrough

We measure, review building requirements and talk through goals, budget and timing.

2

Estimate & selections

Itemized pricing, timeline and help choosing materials and finishes.

3

Approvals

COIs, alteration agreements and permits where your building or the city requires them.

4

Build

Protection, clean job sites and progress updates throughout construction.

5

Final walkthrough

Punch list completed, space cleaned and handed over ready to enjoy.

FAQ

Kitchens questions.

Can't find your answer? Call (917) 714-3200.

Where we offer this service

How long does a kitchen renovation take in NYC?

Most apartment kitchens take 4–8 weeks of on-site work once materials are on hand. Co-op and condo approvals, custom cabinet lead times and permit requirements can add time before we start, so we map the full timeline with you up front.

Do I need board approval to renovate my co-op kitchen?

Usually, yes. Most co-ops and condos require an alteration agreement, drawings and a contractor's certificate of insurance (COI). We provide COIs naming your building and management company and help you assemble the paperwork.

Can you move my sink, range or appliances?

Often, yes — but in apartments it depends on riser locations, gas lines and building rules. We review what's possible during the walkthrough before you commit to a layout.

Do you help choose cabinets and countertops?

Yes. We recommend materials based on durability, budget and look, and can work with your designer or architect if you already have one.

Free consultation

Planning your kitchen project?

Tell us what you have in mind. We'll schedule a walkthrough, talk through options and send a clear written estimate — no pressure, no obligation.

  • Free on-site walkthrough & written estimate
  • COI ready for your co-op, condo or commercial building
  • One point of contact from start to finish
Prefer to talk? (917) 714-3200

We reply within one business day. Your details are only used to respond to your request.

Thank you — your request is on its way. Leo will be in touch within one business day. For anything urgent call (917) 714-3200.
Call nowFree estimate